FR
Technical guide · OPAL Coatings

Installing Floor Coatings in Canadian Winter

Cold-weather installations require more than turning on a heater.

Measure the slab temperature

Air temperature and concrete temperature are not always equal. Check the minimum and maximum application conditions on the data sheet.

Watch condensation

Consider dew point, humidity and temperature changes during the full application and cure period.

Plan ventilation safely

Use manufacturer-required ventilation and PPE. Fuel-burning heaters can introduce moisture or other hazards; follow site safety guidance.

Plan your project

Browse the available systems and products. Always check the manufacturer’s technical data before selecting an application method.

Browse productsExplore systemsFlake coloursContact us

← All articles